Showing posts with label Singgahsana. Show all posts
Showing posts with label Singgahsana. Show all posts

Monday, October 5, 2026

5.10.2026 Monday - good news at the bank

 We go to the bank this morning and get some good news. After which we treat ourselves to lunch in a cafe, the food is good but the portion is small. 

for my own lunch, I blitz up some green juice and enjoyed drinking it. it also kept me quite full for the rest of the day - I will continue with this.


Later in the evening after pickleball, at our kopitiam dinner I decide that I will not eat at these sort of places anymore. I would rather cook two eggs and eat them on toast at home. It will be cheaper, taste better and definitely better for me. 






I make good progress at work; the house with Leong, ID with Rachel, the masterplan with JY, the toilet upgrade with Clarissa and talk about money with Fiona. I also send out the masterplan queries for the Home, the client promises to revert soon. I am very happy with how the ball pen takes onto the recycled blueprint paper, which I have made into sketchbooks.



Thursday, September 24, 2026

24.9.2026 Thursday - time for another drawing list.

  1. Singgahsana concept sketches
  2. SJIS site plan
  3. HSL master plan
  4. Kitchen dwgs
  5. PD pump room
  6. Toorak stairs
  7. AC grilles at Springvale
  8. new penthouse layout
  9. wheels at the column base
  10. spvl screens
  11. access to RC roof @spvl
  12. M&E roof, mark in the columns stump
  13. mark in the spvl shop dwgs, defects
  14. render the breezeway terrace
  15. check up on MAC2
  16. toorak shop dwgs
  17. Strata plans and access









Tuesday, September 15, 2026

15.9.2026 Tuesday - people at the pool


 I go to the pool for a swim at the end of the day but some residents have taken over the club house, having a barbeque. One of them was smoking so I decide to leave after my workout and a short swim, it is ok; I got my shoulder sets in.

I did more drawing today and feel better for it. Tomorrow is a public holiday, so everyone is a little laid back. 

Let's expand on that list a little bit:

Updated list of things to do

  1. PD pump room
  2. Toorak fence and link from main house
  3. RWDP and roofing, 
  4. Car park structure
  5. Retaining wall
  6. Butterfly park
  7. New housing - design brief and concepts, give CAD to engineer, house pricing
  8. SEDC - new budget
  9. AC grilles at Springvale
  10. HP's print out review
  11. speak to Nicole
  12. Terrace masterplan
  13. Santubong house
  14. CHMS toilet



Sunday, May 24, 2026

22.5.2026 Friday - Sean prepares for a talk



We prepare for dinner with the Japs, it is interesting how much I look forward to these little breaks in my routine. These two are warm, genuine and amazingly easy to get along with - considering that we only met in December last year. I am afraid I can't say the same of several of our 'older' friends; one has become secretive and small minded, another also steers the conversation back to herself, and the other is always complaining about something or another.

Sean leaves dinner early, we suggest that to him; he will be giving a talk tomorrow at the PAMSC Centre - form, function and delight.



Monday, April 27, 2026

27.4.2026 Monday - sons and daughters



Yesterday FL came up to me at lunch time and asked if I wanted a takeaway lunch. I declined saying that I'll have a simple muesli lunch, and then joked 'who knows?, Sean might bring me something to eat.., no, he won't, I concluded. To which she said 'that is the difference between sons and daughters'. 

And I thought how sweet of her to express it that way. 



Monday, April 20, 2026

21.4.2026 Tuesday - a good day at the races

 

The office is half empty this morning, some are at the Council reviewing drawings with the officers, others attend a final planning briefing with the client's team before submission. JY and I have a quiet discussion about elder friendly units, four of them; we decide that they are a benefit to the scheme, rather than a hindrance from the regulations. After that, I go through lighting details with CS, who has a good work-plan for each week. I tell HP about her new role in the housing project, she does not seem fazed - the women in our team are resilient and organised; they don't flinch when plans change, or when work load increases - they confer, reset and get to the task at hand. They have a calming affect on me.

In the afternoon, HHH rings and asks if I worked on a former project in JB, I tell him - yes. It seems it might be reactivated. I ask him they are interested to continue, he says he'll check. Later, he rings to say they would like me to continue - I ring the lady in PJ and we agree to set up an online meeting this week. PH might finally have something to get his fingers into over there.




https://www.blurarchitecture.com/old-geelong

Friday, June 6, 2025

7.6.2025 Saturday - no running


The result of two days of talking and thinking about several of the on going projects. Still no exercise because of the sore ankle but had a good session of design chat with Sean about the Toorak House. 

Next week, he starts on the SPVL steel works.










 

Tuesday, February 18, 2025

17.2.2025 Monday - no gym early start.

 

They are lifting again, this time the cross trusses one storey high inside which the hotel rooms are placed.

A good start to the week, I know I will work especially hard this week because we are going away on Sunday. And I am worried about going away - so many thoughts fly through my mind before I fall asleep. I am being silly of course, I tell myself that and that I deserve the holiday. My colleague are taking my absence in their stride, making plans to attend important meeting for me - there is an important one where we have been shortlisted for a housing scheme. 

I pass my work to Jenny, and Sean, and Fiona, and Freddie - instead of sitting down to an office meeting, I sit down with individuals and go through their work.

changing the structural grid proved to be the solution for the re-sizing of the apartment units


Sunday, January 26, 2025

25.1.2025 Saturday - raining so no running about


I hurt my arm yesterday playing tennis, so I am feeling a bit vulnerable and sad for myself. I decide to do something about it. I visit the TCM for a bit of 'cupping' and also blood letting. Running at the gym feels harder than normal, and I go home even more tired. I should simply rest.

The highlight of the day (night) is the lifting of the final module of the Singgahsana steel frame columns. By now, the entire existing building is framed with the new red painted steel structure. 

Saturday, January 18, 2025

17.1.2025 Friday - Steel-lifting Stage 2


 I finally get to work on Block 3, and this morning I have what Ricco would call a good chat with JY. We discuss the practical aspects; Fire-fighting access, circulation, land in front of the river, we also talk about the key concepts which differentiate this with our other schemes for this client - the green link connecting all levels with pauses at every floor, views of the river, architectural language. After this, she sets off to calculate the building volume to work out the extend of the fire -fighting access. 





Block 3 apartments



15.1.2025 Wednesday - plenty of site work






An early start to the day in preparation for a Pre-CPC inspection at Renna, I asked Sam to come along, jokingly saying that she is replacing her son. Sean is busy planning tonight's photo shot of the first steel frames at Singgahsana. 

Andrew has been planning the logistics for the lift; site clearances, traffic control, flood-lights, etc. He has been updating everyone prior to the lift scheduled for 8pm tonight. 

Coincidentally, Eric is in town and wishes to have dinner, I tell him I have to be near this site, and show him our drawings. He is excited and wishes to see the 'lift'. We have dinner at the Kantin, and meet new people fom Taiwan - I don't remember all their names, only that I paid for their dinner and drinks. 

I need to speak to Eric about our plans this year.





 

Tuesday, October 22, 2024

21.10.2024 Monday - chat with Allister, a final payment and then CPC


I arrange for an early morning meet up with Allister over breakfast (his, not mine). We chat about site possession, Practical Completion and direct vendors, we also talk about LD and defects. 

Later Leong and I visit the SPA to sort out our appeal for the condominium in Sibu. It looks like they will support our justifications. I explain the submission of 48 to Azizah.

Sam text me after lunch (broccoli, carrot and tofu omelette) and tells me our fees from 2022 is finally paid. I cannot figure out why there is such a delay in payment by this particular client. To my face he says he is happy with our work, he implies that 'management' might have different perceptions. 

Later I find out that he is the top 'management'. 

But I am relieved that it is finally over, we can move on. It was never the money, we have a healthy cash flow. It is the disappointment of having someone whom I held in high regard let us down. Since the beginning, we were watching out for his best interests and going the extra mile (to settle site issues, coordinate his direct vendors, the provide advice on technical and statutory requirements) Generally, treating him like a work partner or a friend.  

Later that evening, we receive a notice of CPC inspection - another project coming to a close. This one is physical closure while the other one was financial.

Tennis in the evening 500-630pm

Tuesday, July 2, 2024