Tuesday, August 30, 2022

28 Aug 2022 Sunday - new doors


Sam is posing by our new front door, built using construction methods from the RTC renovation: perforated steel panels, steel framing and glass. She said that she's dressed in a similar green colour as the original timber door, that we had since moving in 28 years ago. So, it was a momentous occasion.

Another new door was installed at the top of the stairs to separate the latest cats; Hades and Tuxy from the dogs. It is shut some times during the day for them to roam around upstairs, while the dogs are outside. I imagine that some of the cats will be housed at No. 40 when it is ready this October.

Tuxy



No comments:

Post a Comment