Tuesday, June 16, 2026

16.6.2026 Tuesday - some projects are for training



These are some sketches from our conversation about a housing project, with Fiona and GW - I said I know how to detail the stairs so now I'm recording it on sketches before I forget. These are also useful for someone to take on to produce CAD drawings and model in 3D. We have many people on this small housing project, too many for the fees earned. However, I see it as a way to learn to work with other people; it trains your temperament and your management skills. It also hones your own skills while learning from others more experienced and finally, these projects are good for training our young team members. 
 

Saturday, January 18, 2025

15.1.2025 Wednesday - plenty of site work






An early start to the day in preparation for a Pre-CPC inspection at Renna, I asked Sam to come along, jokingly saying that she is replacing her son. Sean is busy planning tonight's photo shot of the first steel frames at Singgahsana. 

Andrew has been planning the logistics for the lift; site clearances, traffic control, flood-lights, etc. He has been updating everyone prior to the lift scheduled for 8pm tonight. 

Coincidentally, Eric is in town and wishes to have dinner, I tell him I have to be near this site, and show him our drawings. He is excited and wishes to see the 'lift'. We have dinner at the Kantin, and meet new people fom Taiwan - I don't remember all their names, only that I paid for their dinner and drinks. 

I need to speak to Eric about our plans this year.





 

Thursday, December 12, 2024

12.12.2024 Thursday - playing too much.

The day starts well, with a meeting with Freddie and Sean about deadlines for re submissions and drawings production. I'm happy because I figured out the framing for the drop off canopy. 

plans for the drop off and the roof framing

long section through canopy


Afternoon meeting with a client, and although our main projects are going well - one with Building Plans approved, and the other accepted for planning submission, I leave the meeting without the usual sense of achievement. Maybe it is because he's distracted. He has his clients as well, with targets and deadlines to meet.

Tennis at 4, Saturday at 5 until 630 - too much strain on my body. First time playing Donald T, there is something sneaky about him, too much guile behind his smiley face.

Dinner for Sam's birthday is a success, I sit between my 2 women who feed me Korean barbecue. The aunties join us and add chat and laughter to the evening.



Friday, April 12, 2024

12.4.2024 Friday - early start, late finish

Early start to the day, I come to open the door for Doreen, who cleans our office, and then get ready to meet HY about his working drawings. At 9 a.m. - I have a meeting about strata parcels and as built survey. It went well and I learn that it is better if I let the other speak first. I was a little angry about Ken's initial lethargy on this matter, and it comes out in the earlier parts of the meeting.

At noon, I visit a new gym to discuss their offer of a 21-day fitness challenge - it seems that I have to pay a deposit which they can forfeit if I don't achieve the desired results (1-kg minimum or 2% body fat loss). I have a look at their gym, like what I see and sign up. 

I spend the afternoon drawing details on butter-paper, which I enjoy tremendously. Fiona can issue these on Monday.




 

Tuesday, August 30, 2022

28 Aug 2022 Sunday - new doors


Sam is posing by our new front door, built using construction methods from the RTC renovation: perforated steel panels, steel framing and glass. She said that she's dressed in a similar green colour as the original timber door, that we had since moving in 28 years ago. So, it was a momentous occasion.

Another new door was installed at the top of the stairs to separate the latest cats; Hades and Tuxy from the dogs. It is shut some times during the day for them to roam around upstairs, while the dogs are outside. I imagine that some of the cats will be housed at No. 40 when it is ready this October.

Tuxy



Saturday, October 9, 2021

Assembly


Architects make jokes about designing toilets and dog houses when we were architectural graduates; this is partly true as we were often assigned the more menial tasks in the office which require less supervision from the senior architects as the office is busy trying to meet a deadline.

Instead of taking this as a bad thing, see this as an opportunity to refine the finer details of the design; the way materials come together; assembly, the way they interact with the user; comfort, dimensions and palette; economics and costs. As a junior architect, it is sometimes hard to convince the boss to include all your ideas - that's ok, pick your battles wisely and if two out of 5 ideas are included in the built design, consider this a WIN.

This is why we still take up challenges to design small project such as this kiosk for drivers of a wealthy client, it is definitely not for the fees earned (there are no fees). Instead we see it as a chance to explore the above and to go make things with intent, and along the way build relationships. 

More soon, 

 

Tuesday, September 7, 2021

CAT House


Design Statement

History

The corner terrace is located in the old residential enclave of Salak South, which seemed like an odd choice for a young couple who had worked overseas for last two decades. But if one were to consider the proximity to neighbourhood shops and work, and throw in the nostalgia of having grown up in this area - then it seems like a perfectly sensible idea. Especially if one appreciates a locality with history and local colour. It is probably part of the movement to re-inhabit the city, to return to it and fill in the gaps left by the departed (to a better place or to the suburban sprawl).

 


Existing house

The existing house was one we have all visited before, on Chinese New Year visits to often forgotten aunties at a difficult-to-find maze of a housing estate. A single storey terrace with a 6.7 metre frontage, divided into two to share between the living room and the master bedroom, entered from the front of the house. This was followed by another bedroom as the living room evolves into a dining space with the help of a room divider/shelf. There was a third room which faced the back lane, next to the kitchen and toilets. The toilet and bathrooms were in two compartments, no doubt to cater for the number of people in the house. This type of housing and planning was part of the early wave of housing estate or ‘taman’ development to cater for a newly prosperous Malaysia.












Brief

This was to be a house for a dozen cats, several dogs and 3 humans. There was a simple physical brief, primarily about the different zones to be occupied (and segregated) by the feline and canine residents, and also about extending the floor area of the existing house by adding another floor, which we did by using steel primarily to reduce the structural weight of the overall construction.

There was an understanding that the house would be easy to clean and maintain, and well ventilated in view of the number of cats (18) and dogs (2). We continued to detail the external enclosure in a light steel frame with expanded metal mesh; creating a feeling of lightness and airy-ness, and visibility which did not intrude into the privacy of the home. The spaces for the human owners are enclosed within more traditional construction of brick and plaster.

Response

We changed the entrance to the house from the front to the centre of the house, entering through a covered landscaped court. Entering into the centre of the house meant that the habitable rooms can placed at the four corners of the floor plan - where they have views and privacy. The  living and dining space is central to the activities of this house - it is an indoor space with an outdoor component; the screened terrace that extends into the garden where the steel mesh doors are opened. The kitchen and toilet are retained in their original position with the new toilets stacked on top of the existing ones to ease piping connections. A small courtyard is carved out of the building envelope next to the kitchen, to provide cross ventilation, and house water tanks and pumps.

The upstairs floor plan is almost identical to the ground floor, with one difference where the kitchen is replaced by a studio and work space. It overlooks the courtyard which helps to ventilate the space and provides a secondary source of natural light. The family space upstairs is mostly for the feline family, it is where they are housed and fed, sleep and play, etc.

We initially had a more dynamic architectural outlook for the house - but the local authorities required us to emulate the existing pitched roof-scape of the neighbourhood. This explains the roof-form of the new house; the double gables running along the length of the house. We used this to our great advantage in creating tall vaulted ceilings for the upstairs rooms, adding again to the overall lightness of the house.

The construction budget was very small despite the relatively large floor areas; the floor finish is cement render and the soffits of concrete slabs are left unfinished. There are small areas of extravagance such as the suspended steel stairs (easier to clean under) against a backdrop of bare red brick (we retained the existing party wall and built an independent structure front of it). Otherwise the house is an exercise in restraint, using only 5 major materials - concrete, steel, aluminium and glass, brick. The old roof tiles were re-constructed as the front gate post.

The owners moved at the end of 2019, and appear to have settled into their routine. The cats live upstairs separated by a steel mesh screen from the dogs who live downstairs; the humans live in the rooms when they are allowed (by the cats).

End 

 







Thursday, August 19, 2021

Tuesday, April 30, 2019

Steps to the Attic


 Finally issued the drawings for steps to the attic, much to the relief of AL. It is only 750 mm wide, but it is adequate for kids to run up to play in the attic. And once or twice a year, the grown ups would have to go up these steps to bring down the Christmas lights or luggage from the store room.
# prioritizatingmaterialusage