Showing posts with label MAC2. Show all posts
Showing posts with label MAC2. Show all posts

Sunday, May 18, 2025

18.5.2025 Sunday - drawing therapy

I spend the day drawing up the plans for MAC2, there has been some positive feedback from our clients recently. The school hostel has made a return, but I am at best cautiously optimistic. Things to do this week:

  1. prepare an executive summary for the hostel 
  2. check up on 49 status and reply at the BP meeting
  3. issue AI for floor penetrations for the hotel
  4. think about the temple street meeting
  5. technical meeting on Wednesday
  6. issue MAC2 plans and perspectives
  7. Toorak house floor plans and 3D views
  8. discuss TB hotel floor plans
  9. Safari floor plans
  10. Super Santai
  11. review floor plans for school meeting on Tuesday
  12. watch out for the housing sub division reply
  13. has we re-submitted Kensington
  14. what is the status of 4.5 Mile
  15. Impiana BOMBA inspection
  16. Singgahsana BP 
  17. What did Au say about the construction drawings?
  18. some sketches for Jefferey
  19. discuss Springvale construction details




Wednesday, January 25, 2023

24th Jan 2023 Tuesday - Sara 1


One of those days heading towards unproductivity; sleeping in, late breakfast, early lunch, which I countered by accepting an early tennis game with some veterans. I cycled there and back after tennis and completing my 6th consecutive day of swimming. 

I asked for two hours of work - which ended late at 7pm, Sara and realised that I had made a mistake in the skp of Mac2 by making the building too long. In trying to fix it and tally with the CAD dwgs, we stumbled onto a better idea, which she wrote down as:
1. noise pollution for (from0 pool area is reduced. 
2. plans are simpler and easier to execute
3. construction uniformity
4. architectural massing is more proportionate

Well done, I thought and asked her to consult PH and get his agreement (which he did)